Capabilities by area
Everything Quasar 2026.10.15 does, area by area: - issues and configurable workflows; - epics and nested projects; - sprints, boards and metrics; - schedule and Gantt; - work logs, time and money; - client quotes; - documents with review and acceptance, releases and exports; - the asset library and artifacts; - search; - git and version tracking; - deadlines, project inbox and notifications; - users, roles and permissions; - public guides; - data export and retention. Read the section for the area the question is about; each lists concrete, user-visible capabilities.
What Quasar 2026.10.15 does, area by area. Everything listed here is available both in the web app and to agents through the API and MCP, unless a section says otherwise.
Issues and workflow
-
Issue types. Epic, Story, Task, Bug and Sub-task. An issue's type and project never change after creation.
-
Keys and references. Every issue has a readable key per project, such as
ABC-00042. Anywhere an issue is referenced, its key, its id or its in-app link all work. -
Statuses. Backlog, To do, In progress, Testing, In review, Done and Reopened. Each organization can rename them to its own words.
-
Configurable workflow. Which status may follow which, and on what condition, is a workflow drawn in a graphical editor. It is set for the whole organization and can be refined per division, team or project. Available conditions include:
- required sections filled in;
- no open blockers;
- a role or the assignee;
- a current, verified plan;
- a Definition of Done satisfied;
- time logged;
- the code having reached a given branch or version line.
A refused move says which condition failed and why.
-
Closing work. Every Done carries a resolution: Fixed, Won't fix, Duplicate, Cannot reproduce or Incomplete. Work closed as not delivered can go to Done from any status.
-
Sizing and dates. Severity, story points, time estimates, planned start and due dates.
-
What an issue produces. Delivery, investigation, technical or management work. Velocity counts delivery, and the rest is reported beside it.
-
Typed sections. Sections such as pre-analysis, decisions, verification and resolution, configurable per project.
- A pre-analysis can list the files it examined with their checksums.
- It goes stale when those files change, so a plan made on old code is visible as such.
-
Definition of Done. Checklists defined at organization, division, team or project level, copied onto each issue.
-
Relations. Relates to, caused by, duplicates and blocks.
-
Discussion and files.
- Comments on the description or on a single section.
- Attachments, downloadable once the antivirus allows.
-
For the client. A client-facing summary per issue, kept apart from the internal text.
-
History and trash.
- Every change is in the issue's history.
- Deleted issues go to the project's trash and can be restored.
-
Ordering and views. Manual ordering by drag and drop, a "My issues" view, and a home page that adapts to newcomers and to experienced users.
Epics and projects
- An epic groups related issues. It has no sprint, points or severity of its own, and its progress is the progress of its children.
- Projects nest. A project can hold sub-projects, up to a depth the organization chooses. Totals over a project and its sub-projects add up the leaves, per currency, and say when they could not see everything.
Sprints, board and metrics
- Sprint lifecycle. A sprint is Created, Active, then Closed or Cancelled, with one active sprint per project. Closing a sprint asks what happens to unfinished work. Each sprint has planned and actual dates and an overdue signal, and can be archived.
- Target version. A sprint can name the version its work goes into.
- Board. One column per status. Dragging a card moves the issue, and the workflow still applies.
- Backlog versus unplanned. The backlog is work not yet started; unplanned is work in no sprint. Quasar keeps the two apart.
- Metrics, computed when you look. Sprint report, burndown, velocity and cumulative flow.
- Workload. Each person's load against an even share of the sprint's capacity. An over-capacity signal warns and never blocks.
Schedule and Gantt
- One schedule. The schedule is computed by Quasar itself, so every screen and every agent sees the same dates.
- Working calendar and time zone. Working hours, working days and holidays, inherited from the organization down to each project, and a time zone per scope.
- Gantt chart.
- Rows by assignee, parent, sprint or status.
- Move and resize bars with the mouse or the keyboard.
- Critical path and slack shown.
- An equivalent table for screen readers.
- Proposals, never automatic. Quasar can propose a sprint end date from the work in it.
Work logs, time and money
- Work logs. Hours per issue, at the hourly rate in effect when the time was logged. A later rate change never rewrites history.
- Corrections. The author can correct a work log for 15 minutes. A project lead can correct any, and only a lead can change the rate.
- Currencies. One currency per project, with an organization default.
- A first figure. Where an issue has no work log yet, Quasar proposes one from the time the issue spent In progress. Nothing is recorded until someone confirms it.
- Agent sessions. The time an agent spends is measured by Quasar's clock and proposed as a work log, which a person confirms.
Client quotes
- A quote is a priced offer generated from a sprint or a selection of issues, with line items, narrative sections and a total.
- Lifecycle. A quote is Draft, Sent, then Accepted or Rejected. Sending freezes it; to change a sent quote you clone it.
- Templates and review. Each organization configures templates and fixed blocks. A person reviews the quote before it is sent.
- Export. A self-contained HTML file.
Documents
- Typed documents. Markdown documents of built-in types such as architecture decisions, design documents, runbooks, user manuals and API specifications. Each type comes with a template, and each organization and project chooses the types it uses.
- Summary and language.
- Every document has a summary, so a reader or an agent can judge it without opening it.
- Every document has a content language. Built-in templates exist in English and Italian.
- Derived documents. A translation or a client rendition declares its source document. Quasar then shows whether it is aligned with that source, stale or unverifiable.
- Review and acceptance. A document moves from Draft to In review to Accepted, and an acceptance can be revoked.
- An acceptance binds to the exact revision of the text.
- A later edit shows as modified since acceptance.
- Export. PDF, Word, HTML or Markdown. Each file states its organization, key, revision and acceptance.
Documentation releases
- A release is a frozen set of documentation. It is a tree of chapters and sections, heading levels 1 to 6, published in numbered revisions.
- Building a revision.
- You attach documents, which are copied in and split at their headings.
- Quasar shows when a source document changed since.
- You can update from the source with a side-by-side preview.
- Publishing.
- A revision is accepted as a whole, then published.
- Publishing cannot be undone; to change a published release you revise it into a new draft.
- Everything that stops publication is listed at once.
- Files. Each published revision is rendered once to PDF, Word, HTML and Markdown and served from storage.
Asset library and artifacts
- Asset library. Icons, screenshots and image collections, with one file per role, theme and language, and advice on what is missing. Images inserted in documents are pinned when a document or release is delivered.
- Artifacts. The packages, binaries, container images and archives each version delivers.
- The checksum is verified on upload.
- An artifact is immutable once uploaded.
- Antivirus status is shown.
- An artifact can be withdrawn with a reason.
Search
- One search box per project. It covers documents, issue descriptions, issue sections and comments, with results grouped by kind.
- Full-text. Phrases,
orand exclusion with-. Results respect what the reader may see.
Git and versions
- Repository observation. A project can observe one repository on GitHub, GitLab or Bitbucket Cloud. Quasar shows:
- where each issue's code is along the chain of branches, from the issue key in the commit subjects;
- pipeline results;
- the version file;
- the changelog between release tags.
- Read-only, always. Quasar never writes to a repository. Its one write is the webhook subscription that tells it about new commits.
- Version flow. For teams that use version branches and release tags, Quasar proposes the git commands for each step and checks that each step happened. It never runs them.
- Shared resources. A project can declare shared resources, such as a test environment, that deploy scripts check before using.
Deadlines, inbox and notifications
- Deadlines. Dated facts from outside that may break something, such as a certificate expiring or a provider changing a host.
- Kept per organization or per project, and they can repeat.
- Email reminders go out ahead of time, by default 30, 7 and 1 days before.
- Each occurrence is marked handled, with a note.
- Project inbox. Notes for requests nobody has decided on yet. Each is later promoted to an issue, discarded or ticked done.
- Live updates. Open pages refresh when the data under them changes.
- Email. Used for deadline reminders and password resets.
Users, roles and permissions
- Organization roles. Admin, Member and Viewer.
- Project access.
- Project roles are Project manager, Member and Viewer.
- Divisions and teams group people and projects, and can adjust access.
- The project always has the final word.
- Hidden versus refused. Someone with no access to a project does not see it exists. Someone who can see it but lacks the right gets a clear refusal.
- Managing people. Invitations, deactivation, and service accounts for automations.
- Sign-in and second factor.
- Sign-in with Quasar's own accounts or an OpenID Connect provider.
- A second factor by authenticator app or security key, which an organization can require.
- A fresh second factor is required for sensitive actions.
- Audit log. Administrative actions and sign-ins.
Public guides
- Public publications. An organization can make one of its documentation releases readable by anyone, without an account:
- as web pages;
- through a read-only REST API with an OpenAPI description;
- through an MCP server for AI agents.
- Quasar's own guide. Every installation serves Quasar's own product guide the same way. This guide is one.
- The chapter Working with AI agents explains how agents use them.
Data export and retention
- Personal data export. Every user can export their own data as JSON.
- Trash retention. Deleted items are kept for a period the organization sets, then purged.
- Erasing a user. The user is anonymized in place, so the history stays consistent without naming them.